A rain garden is not finished simply because planting is complete. The handover should identify who will look after it, what information they need and how problems beyond routine care will be addressed.
Separate routine care from corrective work
EPA's green infrastructure maintenance guidance calls for regular inspections and upkeep. Tasks can include removing sediment and debris, managing vegetation and repairing erosion or damaged components. EPA also recommends a process for corrective work beyond routine maintenance.
Use the project's actual maintenance plan to distinguish everyday tasks from issues requiring the designer or a specialist. Do not assume a general landscaping visit includes inspection of every drainage component.
Name the responsible people
At handover, record the owner, maintenance contact and route for reporting concerns. EPA notes that property owners should consult local requirements for their specific responsibilities. Keep those requirements alongside the project documents rather than relying on an informal understanding between crews.
For a municipal or shared-property project, clarify who receives inspection notes and who can authorize corrective work. This supports the broader objectives of low-impact development after the construction team leaves.
Give observations a consistent format
A practical inspection entry can include the date, location, photographs, observed condition and next action. Use consistent labels for inlets, outlets and planted areas. Record whether a concern was referred for assessment instead of marking it complete when a message was sent.
Ask the designer for site-specific maintenance triggers and expectations. Avoid borrowing a drainage-time threshold from an unrelated project with different soils or a different design. A clear handover ties the maintenance record to the feature actually built.