Village of Brockport Main Street Water & Sewer
Chatfield Engineers, P.C. provided Design and Constructioin phase engineering services for this project. The location was along Main Street between the north and south Village Line, and consists of the following items:
- Water Main: Replacement of approximately 6,110 LF of 6-12” Water Main, fire hydrants, water services, valves and miscellaneous appurtenances as outlined in the July 10, 2006 Preliminary Cost Estimate prepared by Chatfield Engineers, P.C.
- Sanitary Sewer: Replacement of approximately 5,370 LF of 8-16” sanitary sewer, sanitary sewer laterals, manholes and other miscellaneous items.
![]() | ![]() | |
| Sanitary lateral | Sanitary Sewer Main | |
![]() | ||
| Fire Hydrant Installation | ||