2800 Dewey Avenue
Rochester, NY14616
Phone: (585) 227-6040
Get Directions

Chatfield Image1

Excellence
         by Design

Village of Albion Water Treatment Plant Upgrade

Chatfield Engineers, P.C. provided the Design and Construction Phase Engineering Services for the Village of Albion Water Treatment Plant Upgrade. The project consisted of several contracts as follows:

  • Filter Upgrade for 2.4-MGD Rapid Sand Filter Plant
  • Replacement of Electrical Control System and SCADA System
  • Window and Door Replacement at WTP and Booster Pump Station
  • Three (3) new Emergency Power Generators (100 kW to 300 kW).
  • Heating and Ventilation Improvements at WTP and BPS #1.
  • Precipitator Painting (including removal of lead based paint).

 

 
New Emergency Power Generator   New Control Panels
     
 
     
     

 

 

 

Powered by Site Brand Builder