Chatfield Engineers, P.C. provided the Design and Construction Phase Engineering Services for the Village of Nunda Water Treatment Plant Upgrade. The project consisted of the following:
- Installed a new Rapid Sand Filter.
- Replacement of existing manually operated valves with electrically actuated valves.
- Building addition to accommodate new filter.
- Electrical Controls and Instrumentation.
- Valves, piping and other miscellaneous appurtenances.
- Installation of a backup backwash pump.
![]() | | |