Village of Albion 3-MG Water Storage Tank
Chatfield Engineers, P.C. provided the Construction Phase Services for the 3.0 MG Pre-Stressed Concrete Storage Tank to serve the Village of Albion Water System.
Chatfield Engineers, P.C. provided the coordination with several Contractors, Utility Companies, the Village Board of Albion, the Town Board’s of Albion & Barre, both Highway Departments and the Village of Albion DPW.
The new 3.0 MG storage tank replaced two (2) smaller water storage tanks that provided minimal storage capacity. The project was completed in 1993, within the allocated budget, and continues to serve the Albion Water System flawlessly.
| Pouring the floor slab | Placement of precast wall panels | |
| Painting tank exterior |