Excellence
by Design
Town of Victory Salt Storage Building
The Town of Victory Salt Storage Facility was constructed in 2002 and consists of a 60’ x 120’ high arch gambrel style wood structure with a 25’ wide lean-to for storage of equipment.
The Town of Victory financed the entire project with money generated from the Town General Fund. The salt storage building is located on an 18 acre parcel of land which will be utilized for the future Town Hall, Town Highway Department Building and a recreational complex. These additional projects will be completed as money becomes available.
Chatfield Engineers, P.C. provided the Design and Construction Phase Engineering Services including Resident Project representation during construction. This project was constructed by Park Lane Construction and was completed within a thirty day period.