Excellence
by Design
Town of Scio Water System Improvements
Chatfield Engineers, P.C. provided the Design and Construction Phase Engineering Services for the Town of Scio Water System Improvements. The project consisted of the following:
- Installation of a bag and cartridge filtration unit (100 gpm)
- Construction of a 17’ x 19’ building addition
- Installation of control system & SCADA system
- Backup generators (20 kw & 75 kw)
- Re-construction of three (3) spring collectors.
- Construction of a new Pre-cast wet well & collector building
- 8,000 linear feet of water main replacement
![]() | | |
| Bag Filtration Unit | Inside new spring collector man hole | |
| | |
| Spring collector pumps and piping | New wet well / collector building |