Excellence
by Design
Town of Hector Water Treatment Plant
Chatfield Engineers, P.C. is providing the Design and Construction Phase Engineering Services for the Town of Hector Water Treatment Plant Upgrade. The project consists of the following:
- Pall Membrane Filtration Unit (300 gpm)
- Construction of new 34’ x 40’ Filtration Building
- Two (2) new Backup Generators
- Construction of new Infiltration Gallery
- Filter Backwash Settling & Recirculation System
- 12,000 gallon Clear Well