Town of Greece Cedar Court Pump Station
Chatfield Engineers, P.C. provided the Design and Construction Phase Engineering Services for the Town of Greece Cedar Court Pump Station, which consisted of two 25 horsepower submersible pumps capable of handling 1,080 gallons per minute at 55 feet TDH.
This new pump station replaced an existing pump station that was deteriorated due to age and wear and tear. The new pump station wet well is 10 feet in diameter and 28 feet deep. The Project included construction of a new valve vault, connection to the existing force main, valve pit, electrical controls, and other miscellaneous appurtenances.