Town of Albion Brown Street Bridge Replacement
Chatfield Engineers, P.C. evaluated several alternatives for replacement of the deteriorated Brown Street Bridge, including:
- Corrugated Metal Arch Pipe
- A Steel Bridge Deck with New Concrete Abutments
- A Pre-cast Concrete Bridge Culvert
The pre-cast 21 feet wide x 42 feet long concrete bridge culvert was selected due to lower installation costs, ease of construction, long term durability, and the low lifecycle costs.
Chatfield Engineers, P.C. prepared the Plans and Specifications for replacement of the bridge and relocation of utilities, and provided Construction Phase Services, and Inspection Services.
This project was completed in a timely manner and received partial funding through the offices of NYS Senator George Maziarz and NYS Assemblyman Charlie Nesbitt.
| |
||